Coffee Table Sourcing for Wholesale Buyers
How wholesale buyers specify coffee tables: marble, travertine, tempered glass and solid wood tops, welded metal bases, MOQ, lead

Short answer: at our Foshan factory the minimum order is one mixed 1×40HQ container with no per-model minimum for catalog models; production runs 30–45 days for standard sofas and beds, 45–60 days for custom orders and about 20 days for mattresses, counted from deposit and specification confirmation; and a supplier is verified by visiting both the production base and the showroom, checking certificate scopes against your order, and inspecting goods before the container is sealed.
These are the ten questions importers, retailers and hospitality buyers ask most often before placing a first order. The answers below use the same numbers we quote in our own sales process, so you can compare them directly with any other Foshan supplier.
Our minimum order is one 40HQ container in total. Different models and different categories can be combined inside that container, and there is no per-model minimum for catalog models — you do not have to buy a fixed number of one sofa to unlock a price. Custom OEM programs with new tooling or dedicated materials are quoted per project, because quantities there depend on the specification. The models available for a mixed container are listed in the collections index.
If a supplier quotes a per-model minimum of 20 or 50 pieces, ask whether that is a production constraint or a sales policy. On upholstery lines the real constraint is usually fabric minimums per colour, not frame quantity.
Production starts after the deposit and the signed specification, not after the inquiry. From that point:
Two things routinely add time and are worth planning for: fabric or leather that has to be produced to order, and finishing approvals that arrive after production has started.
The standard structure is 30% deposit by T/T, 40% before production is completed and 30% before shipment. L/C at sight is accepted for orders above one 40HQ.
This split matters more than the headline percentage: the 40% milestone is your last practical point to change a detail before goods are packed, and the 30% balance is the point at which you should already have inspection evidence in hand.
Verification is not a document check alone. The six checks below are the ones that actually separate a factory from a trading office.
A quote you can compare should state the model code and dimensions, the material and finish, the packing method, the loading quantity per 40HQ, the MOQ position, the lead time from deposit, and the Incoterm. We quote EXW, FOB, CIF and DDP; under FOB Foshan or Shenzhen the price includes factory cost, inland haulage and export clearance to the port, and you book the ocean freight and insurance.
One 40HQ container in total, with different models mixed inside it and no per-model minimum for catalog models. A 40HQ typically carries three to five sofa models or three to five bed models. Project orders are quoted as packages rather than against per-model MOQs, and custom OEM programs are quoted per project.
Yes. Sofas, beds, dining, mattresses and casegoods can be consolidated in one container with one invoice and one loading plan, and goods from your other FF&E suppliers can be received, checked and shipped in the same container through our consolidation service. Catalog models across sofas and beds are the most common mix.
30–45 days for standard sofas and beds, 45–60 days for custom orders and about 20 days for mattresses, counted from deposit and specification confirmation. Project orders follow a confirmed milestone schedule, with a standard project lead time of 45–60 days depending on scope. Repeat orders are usually faster.
30% deposit by T/T, 40% before production is completed and 30% before shipment. L/C at sight is accepted for orders above one 40HQ.
Samples are billed at sample price with freight collected, and the sample cost is credited against your bulk order. Stock fabrics can be sent free of charge. For OEM sampling, feasibility and sample cost are confirmed within 2–3 business days, and the sample is ready 7–10 days after approval.
Visit the production base and the showroom in person, ask for the scope named on each ISO certificate, request third-party lab reports on a comparable specification, and ask for photo and video QC reports at incoming, in-line and finished-goods stages. You should also be allowed to inspect goods, or send a third-party inspector, before the container is sealed.
ISO 9001:2015 for quality management and ISO 14001:2015 for environmental management, with the scope of each certificate checked against your order. OEKO-TEX Standard 100 applies at supplier material level for textiles and leather. Market-specific testing is commissioned per project: EN 12520, EN 1021-1/-2, BS 5852, CAL TB 117, REACH, Prop 65 and BIFMA.
Yes. Photo and video QC reports are sent at three stages, and you or a third-party inspector are welcome on site before the container is sealed.
EXW, FOB, CIF and DDP. FOB Foshan or Shenzhen covers factory price plus inland haulage and export clearance to the port; CIF adds ocean freight and marine insurance to your destination port; DDP covers door-to-door delivery including freight, insurance, duties and last-mile delivery.
Visits run Monday to Saturday, 9:00–18:00 GMT+8. Send your travel dates, the number of visitors and the models you want to see; the itinerary is confirmed within one business day, with pickup from Guangzhou Baiyun Airport or Foshan West railway station. The factory and showroom are about 40 minutes apart, so both can be covered in one day.
Factory-direct from Foshan · any models mixed in one 40HQ · replies within 24 hours on business days.
SCAN TO ADD OUR WECHAT
Leave a Comment