Upholstery Manufacturing in Foshan | 20 Years (Since 2006)
Turnkey furniture package for a residential project by ATTICO CASA
FOR DEVELOPERS, CONTRACTORS & PROCUREMENT TEAMS

Turnkey Furniture Packages for Property Projects

One factory contract covers specification, mock-up, production, phased delivery and export documents — furniture packages for villas, apartments, serviced residences and commercial fit-outs.

20+
Years Custom Manufacturing
1,000+
SKU Design Library
45–60
Days Production Lead Time
100%
Pre-Shipment Photo & Video Approval
ISO 9001:2015 · OEKO-TEX Standard 100 (supplier materials) · Third-party testing arranged per project (EN / BS / CAL / BIFMA)
WHO WE SUPPLY

Five Project Types, One Accountable Factory

Different buildings, same requirement: furniture that arrives on schedule, on spec and on budget.

Property Developers

Show flats and full-unit packages for residential projects — repeatable per-unit pricing across phases and towers.

Serviced Apartment Operators

Durable, replaceable furniture programs with a locked SKU list, so damaged pieces reorder identically years later.

Contractors & Fit-Out Companies

We quote against your BOQ, deliver per floor handover and supply the compliance documents your client requires.

Interior Design Firms

Your drawings, our workshop — feasibility checked before quoting, mock-ups approved before mass production.

Hotel & Hospitality Groups

Hotel FF&E runs on a dedicated scope — see our hotel project solutions page.

THE PROJECT PROCESS

From BOQ to Handover — Six Documented Stages

Every stage has a deliverable you approve before the next one starts.

01

Project Brief & BOQ (Week 1–2)

Send your bill of quantities, drawings or reference photos. We map every line to a spec and flag feasibility issues before pricing.

02

Specification & Pricing (Week 2–3)

An itemized proposal: per-unit pricing, material specs, packing volumes and a phased delivery plan matched to your construction schedule.

03

Mock-Up Room (Week 3–7)

One complete room or show flat set produced for sign-off. Materials, colors and finishing standards lock against the approved mock-up.

04

Mass Production (Week 7–14)

Production runs on a dedicated schedule with photo and video updates. Capacity is reserved at PO, so your timeline holds.

05

Phased Delivery

Completed goods are warehoused and released per building, tower or floor handover — containers arrive when your site is ready.

06

Documents & After-Sales

Full export document set, test reports where commissioned, spare-parts support and identical reorders on the locked SKU list.

WHY PROJECT TEAMS CHOOSE US

One Contract Instead of Twenty Suppliers

Project furniture fails on coordination, not craftsmanship. We remove the coordination.

01

Single factory accountability

One contract, one production schedule, one QC standard and one project manager — instead of a spreadsheet of suppliers.

02

Phased to your construction schedule

We hold finished goods and ship per handover milestone, so furniture never lands before the site can receive it.

03

Compliance documentation

ISO 9001:2015 factory system, supplier-level OEKO-TEX textiles, and third-party testing arranged per market — see certifications.

04

Value engineering

We re-spec materials and construction to hit a target per-unit cost without visible compromise — a workshop conversation, not a sales trick.

PROJECT SNAPSHOTS

Real Programs, Real Constraints

Representative project structures — scope, hard point and outcome.

Gulf Operator — Serviced Apartment Rollout

Scope: complete furniture packages for serviced apartment units across multiple buildings — sofas, beds, dining and casegoods on a locked SKU list with phased delivery per building handover.

Hard point: holding identical fabric and finish across phases separated by months, so a unit furnished in phase three matches phase one exactly.

European Developer — Show Flat & Villa Program

Scope: furniture for show flats and a villa cluster, built to the designer's drawings with a mock-up room approved before mass production.

Hard point: translating design intent into production specs without losing the details that sold the units — curved upholstery, mixed materials and custom dimensions.

PROJECT TERMS

Commercial Terms, Up Front

The numbers your procurement file needs.

ItemDetails
Project minimumFrom one full container of furniture; smaller needs fit our wholesale program
QuotationItemized per-unit pricing against your BOQ, free of charge
Mock-up roomCharged at cost, credited against the project order
Production lead time45–60 days per phase after mock-up sign-off
Payment30% deposit, 40% during production, 30% before shipment
ShippingEXW / FOB / CIF / DDP — phased releases warehoused at our cost within the agreed window
Warranty3–5 years structural, 1 year upholstery; spare parts on the locked SKU list
DocumentsCI / PL / CO, certificates on file and project-commissioned test reports
FAQ

Project Furniture Questions, Answered Straight

If your question is not here, ask us directly — we answer within 24 hours.

What is the minimum project size?

Project pricing starts from a full container of furniture — typically one multi-unit show flat, a villa package or a phased apartment rollout. Smaller needs are better served by our wholesale program.

Do you build a mock-up room before mass production?

Yes. For multi-unit projects we produce one complete mock-up room or show flat set for your sign-off — materials, colors and finishing standards are locked against it before mass production starts.

Can deliveries be phased to match our construction schedule?

Yes — phased production and shipment is the standard project structure. We hold completed goods in our warehouse and release containers per building or floor handover.

Do you handle hotel FF&E projects?

Yes — hotel and hospitality FF&E has its own dedicated scope. See our hotel project solutions for the full FF&E structure, or send us your BOQ directly.

Do you provide installation?

Furniture ships with assembly sheets and hardware kits, and we support your local installation team remotely. On large programs we can dispatch a supervisor for the first installation phase.

Can you produce to our designer's drawings?

Yes. Send the drawings or BOQ — feasibility is checked by our workshop before quoting. Fully custom designs run through our OEM/ODM service with NDA protection.

Have a BOQ or a Floor Plan?

Send your bill of quantities, drawings or reference photos — our project team replies within 24 hours with a preliminary proposal and a per-unit cost model.

Lost in Foshan?

Our WeChat location pin is more accurate than your map.

ATTICO CASA

Request a Factory Direct Quote

  • Factory-Direct Pricing (No Middleman)
  • DDP Global Logistics (Door-to-Door)
  • Custom OEM/ODM Design Support
  • Strict ISO 9001 Quality Control
ISO 9001:2015
Please verify you are human Success!
No file selected