Upholstery Manufacturing in Foshan | 20 Years (Since 2006)
Solutions
ATTICO CASA FOSHAN FURNITURE CO., LTD.
RETAILERS & PRIVATE PROJECTS

One factory signs off
the whole fit-out.

FF&E for hotels, serviced apartments, show flats and residential handovers — sofas, beds, mattresses, dining and lounge from one production line, under one QC standard, on one delivery schedule.

EXPLORE
DESTINATION: FOSHAN

The Global Capital of
Furniture Manufacturing

Why visit us? Because in Longjiang, Foshan, you are at the source. Our 5,000m² showroom connects directly to the production line, offering transparency and choices you can't find online.

Foshan Furniture Showroom

Cost Efficiency

By sourcing directly from the industrial cluster, you save 30-50% compared to coastal trading cities or local wholesalers.

5,000m² Selection

See, touch, and feel. Our massive showroom displays complete living, dining, and bedroom collections in real-life settings.

Instant Customization

Material library on-site. Discuss changes with engineers and see leather/fabric samples immediately.

Challenges We Solve

FOR RETAILERS & PRIVATE PROJECTS

Italian Minimalist Furniture
THE CHALLENGE

Your local market is flooded with generic mass-market styles. Retailers fight price wars; Homeowners can't find unique high-end pieces.

OUR SOLUTION

Italian Minimalist & Light Luxury

Differentiation is key to value. We provide access to 1,000+ trending Italian minimalist and light luxury designs that are scarce in your local market. Stand out with aesthetics comparable to top Milan brands.

Factory Direct Pricing
THE CHALLENGE

Middlemen layers (importers, local wholesalers) add 3-5x markups. Your margins shrink, and your project budget explodes.

OUR SOLUTION

Factory-Direct Value

Cut out the intermediaries. As a factory alliance, we offer direct pricing that saves you 50-70% on sourcing costs. Maximize your retail margin or your project budget.

Bespoke Customization
THE CHALLENGE

Standard catalogues limit your creativity. Off-the-shelf furniture rarely fits specific layout dimensions or your client's unique aesthetic themes perfectly.

OUR SOLUTION

Bespoke Customization

We translate your vision into reality. From precise dimensions to exclusive fabric selections (Grade A+ Leathers, Premium Textiles), we tailor every piece to match your project's soul.

Zero Risk Execution
THE CHALLENGE

Importing is complex and risky. Unverified quality, broken goods, and customs headaches can quickly become a project manager's nightmare.

OUR SOLUTION

Zero-Risk Execution

We handle the complexity end-to-end. From rigorous Video QC Inspections to consolidated DDP (Door-to-Door) delivery, we ensure your goods arrive pristine and on time, anywhere in the world.

WHY CHOOSE ATTICO CASA

4 Reasons to Make Modern Light Luxury
Your Profit Engine

01

CLEAR POSITIONING

We focus on Italian Minimalism & Modern Light Luxury. Designs that balance elegance with market demand.

  • Trending Aesthetics
  • Mid-to-High End Market
  • Avoid Price Wars
02

DIRECT PRICING

Factory-direct FOB/EXW pricing transparency. Maximize your retail margins.

  • No Middlemen
  • Tiered Volume Discounts
  • Consistent Pricing
03

FLEXIBLE MODE

Whether you need spot inventory or bespoke customization, we support your business model.

  • Stock: 7-Day Dispatch
  • Custom: 45-Day Lead Time
  • Mixed Container Loading
04

PARTNER GUARANTEE

We build long-term relationships based on trust, quality, and reliable support.

  • 30-Day Quality Warranty
  • Priority Production
  • Marketing Material Support

Ready to upgrade your product line?

GET QUOTE

Flexible Cooperation Models

Whether you are a retail store owner, an interior designer, or a brand builder, we have a tailored solution for you.

Wholesale & Stock

Wholesale &
Stock

Ideal for furniture showrooms needing fast turnover. Access our ready-to-ship inventory of light luxury bestsellers.

  • MOQ: 10 PCS / MIX
  • LEAD TIME: 7-15 DAYS
Private Projects

Private Projects

From luxury villas to high-rise apartments. Full customization with factory-direct savings and dedicated project support.

  • MOQ: NO MINIMUM
  • LEAD TIME: 30-45 DAYS
OEM Custom

OEM Custom

Build your own furniture brand. Custom designs, logos, packaging. Full end-to-end manufacturing support from concept to container.

  • MOQ: 50 PCS / MODEL
  • LEAD TIME: 45-60 DAYS
DISCUSS YOUR MODEL

FOR PRIVATE PROJECTS

Custom Solutions for Retailers & Project Buyers

Furnishing a villa or luxury apartment? We offer a factory-direct solution that combines customization flexibility with wholesale pricing.

01

BOOK VISIT

Contact us to schedule your showroom appointment. Send us your floor plan in advance.

02

SELECTION

Visit our 5,000m² Foshan showroom. Browse thousands of models with a dedicated consultant.

03

CUSTOMIZE

Select fabrics, leathers, and finishes. We adjust dimensions to fit your specific layout.

04

PRODUCTION

Your order enters our production line. We provide photo updates during the manufacturing process.

05

DELIVERY

Final QC inspection. We pack securely in wooden crates and assist with logistics arrangements.

Ready to create your dream home?

BOOK SHOWROOM VISIT

Lost in Foshan?

Our WeChat location pin is more accurate than your map.

ATTICO CASA

Request a Factory Direct Quote

  • Factory-Direct Pricing (No Middleman)
  • DDP Global Logistics (Door-to-Door)
  • Custom OEM/ODM Design Support
  • Strict ISO 9001 Quality Control
ISO 9001:2015
请验证您是真人 成功!
No file selected
Italian light luxury curved leather sofa specified for a residential project
FOR DEVELOPERS, CONTRACTORS & DESIGNERS

One Factory Signs Off the Whole Fit-Out

FF&E for hotels, serviced apartments, show flats and residential handovers — sofas, beds, mattresses, dining and lounge from one production line, under one QC standard, on one delivery schedule.

WHERE WE FIT

Who We Build For

We are not the cheapest line in your tender — we are the one that holds a full upholstered scope together.

Hotels & Serviced Apartments

40–150 CBM per phase. Matching leather batches across 80 beds and 120 sofas, one abrasion standard across every piece, one staging schedule you can put in front of your client.

Show Flats & Sales Galleries

10–40 CBM, frequent re-orders. Design fidelity that survives the photographer's lens and the buyer's walk-through — delivered before your launch date.

Residential Handover Programs

100–300 CBM, phased delivery. Multi-batch consistency across towers, packing lists by unit and floor, full document set for your site team.

Design Studios & Fit-Out Contractors

5–20 CBM per order, but the project entry. Custom dimensions and finishes with structural feasibility checked by our workshop before we quote.

WHY ONE FACTORY MATTERS

Four Things a Single-Source Partner Changes

Project procurement is already complex. We remove the coordination layer.

01

One BOQ, not five.

Sofas, beds, mattresses, dining, tables and chairs come off the same production plan — your bill of quantities has one supplier column, one set of HS codes to manage, one place where a batch discrepancy gets resolved.

02

Consistency is manufactured, not promised.

Same foam lot density, same leather batch program, same frame spec across every unit — because there is one factory drawing the line. We allocate your batch materials together at order confirmation, not per piece.

03

We stage to your handover sequence.

Containers break by floor, by building, by phase — packed and labelled so your site team unloads directly to the right unit. No warehouse re-sorting on your side.

04

Your deadlines get our capacity buffer.

We hold monthly orders at 90% of capacity; project bookings reserve their window at PO. When fabric or shipping slips, the 10% absorbs it — that is what it is there for.

THE PROCESS

From Drawings to Delivered — You Always Know What Week You’re In

Every stage has a documented output and a confirmed date before production starts.

01

Day 0 — Briefing

You send drawings, the FF&E list and your mood board. We review scope, buildability and your handover date before quoting.

02

Day 1–3 — Feasibility Check

Our design team checks feasibility with the workshop: a layout suggestion, plus a flag on anything that can’t hold structurally.

03

Day 3 — BOQ & Freight Quote

Unit price, CBM per item, container plan and all four freight columns — the same quote structure you see on our container shipping page.

04

Day 5–10 — Material Approval

A material sample box is couriered to you or shown on video. Leather, fabric, foam and hardware swatches are signed off before production release.

05

First Sample — Sign-Off

The first physical sample is produced, then approved on photo and video before the batch is released.

06

30–45 Days — Batch Production

Batch production with staged QC. A weekly progress photo set is referenced against your BOQ item numbers.

07

Pre-Load — 100% Inspection

Every piece is inspected and recorded on video. Loading starts only after your sign-off.

08

Loading — Per the Layout Plan

Loaded per the agreed layout plan, with a container loading photo series and the seal number sent to you.

09

Delivery — DDP / CIF / FOB

Delivered per your tender terms, with a packing list by unit/phase, ISPM-15 certificates and test documents.

WHAT YOU RECEIVE

Documentation a Project Team Can Actually Use

Approval trails and specifications, not verbal promises over chat.

Itemized BOQ

One clear bill of quantities with factory-direct pricing — no bundled lump sums.

Dedicated Project Manager

One point of contact from briefing to delivery, not a rotating sales desk.

Specification Sheets

Material, finish and dimension documentation for approvals and site teams.

Milestone Photo Reports

Photo evidence at each production stage and before container loading.

SPECIFICATIONS

What We Write Into the Contract

Parameters you can copy into your procurement officer's tender document.

ItemStandard we manufacture toStated in contract
FrameKiln-dried larch solid wood, CNC precision cut✓
Foam — seatHigh-resilience ≥ 45 kg/m³✓
Foam — backHigh-resilience, density matched to seat lot✓
LeatherItalian top-grain, >50,000 Martindale abrasion cycles (supplier test report)✓
FabricMartindale cycles and pilling test per supplier batch report✓
Seat suspensionSerpentine spring + elastic webbing✓

Mechanisms (recliners): tested per project against tender requirement. We do not claim certifications we have not commissioned.

COMPLIANCE & TESTING

What We Hold Today vs. What We Arrange

Honest inventory of certifications and project-level testing capability.

What we hold today

  • ISO 9001:2015 — quality management system
  • Material-level certifications from suppliers: polyurethane foam, pocket-spring components, textiles (OEKO-TEX Standard 100 where applicable)

What we arrange per project

  • Upholstered pieces tested to your tender's required standards — commonly EN 12520 (seat strength), EN 1021-1/-2 and BS 5852 (ignition), CAL 117 / CA TB 117 (flammability), REACH & Prop 65 documentation.
  • Testing commissioned through accredited third-party labs against your signed sample.

Cost rule: first-time tests on a new spec are borne by buyer; credited against project orders over 50 CBM.

We do not display "FSC Mix", "Pinnacle Awards" or "High-Tech Enterprise" labels on export pages — these carry no trust weight with international project procurement officers. We prefer the space for parameters you can verify.

PROJECT STORIES

Factory Validation & Sample Programs

Real process work, not stock renders. These are the programs that built our project capability.

Foshan, China

Full-scope sample program: sofa, bed, dining set, lounge chairs

Hard point: matching leather batch colour across four different product categories under showroom lighting.

Foshan, China

Client-specified fabric + custom dimensions on a 3-seater and king bed

Hard point: structural check on a 15 cm leg extension — workshop confirmed load bearing before sample cut.

Foshan, China

Batch inspection across sofas, beds and dining for a residential tower mock-up

Hard point: keeping foam density lot consistent across 60 units when supplier batch sizes vary.

These are process-validation programs, not completed delivery projects. We label them honestly — a verified process is worth more than a fabricated case study.

Send Your Drawings. Get a 72-Hour Answer.

You'll receive: feasibility flags, a unit-level BOQ with the CBM and container plan, and one freight number per leg. If your budget can't reach our line, the quote will say so — that saves your week and ours.